Smart Commissioning Savings Calculator
Simplify commissioning to shorten project schedules.
Total Savings with Smart Commissioning
Hours Saved
$ USD Saved
See details of the calculation below and calculate your own savings.
Traditional Commissioning
Smart Commissioning
Total Hours
Total Costs
$ USD
$ USD
Hours to loop test all HART instruments
Preparation hours (system setup)
Number of HART Devices
Average number of engineers per test team
Detailed Summary
System Preparation
Traditional Commissioning
Smart Commissioning
1)
2)
n/a
3)
n/a
========
========
Total Hours
Preparation costs (systems setup)
$ USD
$ USD
Commissioning HART Instruments
Configure Instrument [minutes]
Traditional Commissioning
Smart Commissioning
1)
2)
3)
4)
5)
6)
7)
8)
========
========
Total Minutes
Loop Test Instrument [minutes]
Traditional Commissioning
Smart Commissioning
1)
2)
3)
4)
5)
6)
========
========
Total Minutes
Settings
Time to change one instrument parameter using AMS Device Manager/handheld
Minutes
Average number of instrument settings adjusted (not using predictive maintenance)
Average number of instrument settings adjusted (using predictive maintenance)
Time to create a user configuration for a new instrument in AMS Device Manager
Hours
Time to bulk configure or assign user configuration to HART tags
Hours
Time to document configuration changes when not using AMS Device Manager
Minutes
Time to navigate to a device
Time to connect to device in handheld
Smart Commissioning
Before v14
After v14
Configure instrument with user configuration
Perform five-step test
Document test results
Instrument configuration documentation
Note: The Smart Commissiong Saving Calculator is based on the Best Practices Guide for setting up and using DeltaV and AMS Device Manager software. Calculations of actual time spent and savings in using DeltaV and AMS Device Manager software may vary from what is illustrated in the calculator.
From Hours, to Minutes, and Now to Seconds. The Evolution of Smart Commissioning.
Positively impacting the overall certainty of project execution, Smart Commissioning helps automation projects meet strict and shifting deadlines. New functionality in the DeltaV™ distributed control system (DCS) and AMS Device Manager asset management software improves device binding configuration, testing, and documentation.
Initiate a One-Click Commissioning Process
Take commissioning off the critical path – included in v14 is a new commissioning application that allows you to manage the entire commissioning work flow for commissioning HART devices. There is also a new studio environment, called I/O Studio, that allows you to define device templates – imagine simply initiating a “one click” commissioning process – it’s that easy and that fast.
Simplify Commissioning to Shorten Project Timelines
Smart Commissioning dramatically reduces timing and effort by providing an efficient progression from device initiations to process startup.